MATERIAL NEEDED FOR PILE CAPS ???

Question :

Find out the material consumption for casting the Pile caps ( 65 Nos ) at a project .

Data from the drawing :

 SIZE OF THE PILE CAP :

750mm X 750 mm X 750 mm.

Material consumption for Concrete M20 :

  1. Cement : 87 Bags/ CuM
  2. Sand : 41 CuM.
  3. Aggregate : 0.83 CuM.

 

M20 Concrete :

Volume of Pile caps : 65 Nos X 0.75 X0.75 X 0.75 = 27.42 CuM,

Material consumption for Concrete M20  for 65 Caps :

  1. Cement :   42 X 7.87 Bags/ CuM                                               = 216 Bags
  2. Sand :   42  X 0.41 CuM.        =     11.24 CuM. X  0.3529 =  3.96 Brass
  3. Aggregate : 27.42 X 0.83 CuM. = 22.75 CuM. X 0.3529 =   08 Brass.

Remember :

1 Bag of Cement  = 50 Kg.

1 Brass = 100 Cubic Feet.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s