How line out is exactly done ?

Background :

In a previous article, we made a check list for all tasks to be completed

from land acquisition up to columns of the ground floor. [ Read the previous article ]

Under the Part 03, we saw the steps from line out to the ground floor columns.

Now in this article, let us further focus on:

How exactly the line out is carried out and

How the footing excavation is done:

  1. Line out :

This is done by the contractor in the supervision of the architect & clients.

Usually, the contractor’s engineer does the line out which is verified by the architect and the clients.

For line out, following items are needed:

MATERIAL FOR LINEOUT

Now , let us see what are the basic steps for the line out :

STEPS

Let us see , how does it look after fixing the boundary/railing on the construction site :

IMG02781-20130108-1150

Advertisements

One thought on “How line out is exactly done ?”

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s