Today I plan to take you for a site visit.11

This site is quite near to the river .

25

The hard strata at this location is not available till almost 7 Meters and hence PILING was considered as a better  option as compared to OPEN foundations

You shall see the piling work actually taking place here.

IMG_20160301_104832

What you are seeing in this picture is the TRIPOD used for the piling which is done by the HAMMERING METHOD.On the right side, you can see the WINCH which pulls the dead weight ( HAMMER ) upto the top of the TRIPOD through a steel wire.

The Hammer gets dropped from a height of 6 m and penetrates the ground.

For the upper most soil which is liable to collapse inside the bore , a casing pipe of about      2 M length is used. After this depth , there is a reasonably soft soil and hence soil does not collapse.

You can see the CASING PIPE in this photograph.

26

After doing the boring for about 7.25 M to 7.5 M , hard rock is available.

The hard rock is also cut through CHISELING [ mounted with the dead weight ].

So pile goes inside the hard rock for about 300 mm to 450 mm.

The specimens of soil and rock fragments collected from different depths are properly preserved and tagged with information like Pile no , depth ,time etc.                                            [ This is used for exact analysis of the strata when needed ]

Now the Re-Bar cage is lowered inside the fresh boring .

15

You might be interested to know the details of the PILES.

PILE Dia : 500 mm.

REBARS :

Main bars :6 Nos x 20 Ribbed bars of Grade 500.

Rings :

  1. Circular rings 6 Dia. MS @ 200 mm C/C on the inside of cage
  2. Helical rings 6 Dia. MS @ pitch of 200 mm on the outside of cage

16

Set of helical rings ready for fixing on the cage.

Following picture shows the drum on which these helical rings are mould.

17

This picture shows the stand on which the PILE CAGE is prepared.

18

After lowering the REBAR cage , concreting is done for the pile.

It is done with a TREMIE so that concrete can be poured directly at the base of the PILE.

This is important so that segregation of concrete does not take place.

IMG_20160301_104832
USE OF TREMIE FOR CONCRETING

Remember : The practice is to cast all PILES which are bored in a day.                                            This is important from :

  1. Safety point of view.
  2. To avoid the risk of soil getting collapsed overnight
IMG_20160301_104403
AUTHOR WITH THE ENGINEERS AT SITE.

12

THANK YOU SO MUCH ..

10

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s