It really depends on the usage of the terms. But the most
likely distinction would be that an Architect has passed the registration exam.
A very rigorous exam administered by the NCARB. (some Architects use this as a
suffix to their name) This test is not one that measures design skill. It test
critical and technical knowledge related to the practice of architecture. The description
most often used is that the ARE tests a candidate’s knowledge to ensure health,
safety and welfare.
An architect is licensed by passing this test. It is very much the equivalent
to the Bar examination for the legal profession. The test is 7 parts and each
part ranges from 3-6 hours per test. Some take this exam over a period of time
(weeks to months). The passing rates for the exam are fairly low. (some section
in the 40% range) So to pass this test, you are required to be very knowledge
about much more than just architectural design. I would wager that most who
have passed this test would never call themselves an ‘”architectural
designer”. They have worked hard to achieve the title of
“Architect”. Someone who has passed this exam may have several
suffixes to their name:
AIA – Means they are a registered/ licensed architect who is a member of the
professional organization American Institute for Architects (aia.org)
RA – Means they are a registered/licensed architect. RA= Registered Architect.
They have passed the exam (may be a member of Society of American Registered
Architects, SARA)
NCARB – They are accredited by the National Council of Architectural Registration
Board. They have passed the exam and maintain their accreditation with NCARB
Now an “architectural designer” may have the exact same education,
training, etc. as the above architect. But this person has not taken or
passed the registration exam. They cannot provide a set of “sealed”
documents that are required by many municipalities to get a building permit for
a construction project. They may have been in the architecture profession for
many, many years or just came into the profession and have a degree in design.
But they may not. The use of the terms architect and architecture are usually
well governed, but depending on your location, architectural designer may be
acceptable to describe someone with little to no architecture education. This
will vary by location.
All of this is not to say that an “architectural designer” is not
capable of doing a job as well as an “architect” but the designer has
not had to meet a certain set of qualifications and education to hold the title
of “architect”. And depending on your needs, both of these can
provide you with services. I, being a registered architect, would prefer
someone to select an “architect” for all their project needs.
A competent RCC contractor has been finalized after several rounds of negotiations and the contract has been awarded.Architectural plans ,foundation details and the Center Line plans have been issued by the Architect.
RCC contractor has mobilized on site.
labor hutments have been erected and labour have mobilized.
Cement godown & water tank constructed .
Plot has been properly enclosed with corrugated sheets on the boundary.
A security agency has been contracted for detailing the round the clock security for the site.
Center line Railing has been done and footings center lines have been marked.
RCC consultant has inspected and approved the center line markings.
Plinth level has been decided by the architect and marked on the wall of site office.
Key Materials such as cement ,sand aggregate, Tor steel, binding wire & cover blocks have been procured.
Concrete mix has been finalized based on the actual samples of materials taken from the site.
3.Actual construction :
3.A Below the plinth
Mass excavations have been completed with a hired excavator.
The black cotton soil which is not suitable for back filling has been transported outside.
The actual sub strata or the foundation level has been approved by the RCC consultant at site.
Line out has been given for the leveling course and PCC has been completed for the entire basement raft.
Box type waterproofing has been completed. Raft reinforcements have been put into position .
Dowel bars for the periphery walls & intermediate columns have been tied.
Cover blocks have been put .Pour card has been filled up.
The basement raft has been concreted with the help of RMC .
Side walls have been cast and box type of water proofing has been done on the external face.
the intermediate columns have been cast and roof slab of the basement has been completed.
3.A Above the plinth
4.Handing over:
Author’s note :
Starting from this post , we shall be detailing on these phases in a series of articles.
The author would like to present focused information in different articles so that the absorption of knowledge is gradual but effective.
In the subsequent articles , we shall continue our journey above the plinth.
Construction starts with a dream of the builder and gets completed when the final cheque from the last customer is realized In this article we are going to review various decisions one has to take before the actual construction starts.
1.Lonecrusader?
The first decision which a builder needs to take is whether he shall be working alone on this project or needs a financier with him.
This has a few situations ;
1.Working with own funds
2.Having a working partner with him who shall also do part of the investment.
3.Having a sleeping partner [ financier] who shall not be operationally active.
4.To take loan from financial institutions.
Each decision has its own merits & demerits.
2.Ownland ?
Having decided mode of finance , the next decision is whethertoconstructthebuildingonownplotoritcanbedevelopedwithsomeoneelse’sland.
There are various practices followed.
For example,one such arrangement is called 60:40 method.
Here the builder does not do any investment in plot but has to bearentireconstructioncost. Outofthefinalpropertydeveloped, hehastoallot 40% ofthetotalbuilt uptothelandlord. Land lord may either do the marketing of this 40% property himself or through the builder .
Sometimes the builder may agree to pay the cash equivalentof 40% ofthepropertytothelandlordatthe prevailing marketrate.
3.Taketherightpeopleto plan :
Third decision is the appointment of Architect
The architect is appointed usually through previous association or references obtained within group.
For some , this selection is very simple, an architect who can give maximum yield on the given plot is considered eligible.
( Maximumbuilt upareapersqft. ofland)
Some builders consider the overall planning, uniqueness of design etc vital attributes in architect’s selection. And of course the crucial criterion is the professional charges of the architect.
4.PackagedealincludesRCCdesigns?
Another decision is whether to appoint RCC consultant separately ?
Various options exist: 1. Architect himself is also the RCC designer. 2. Architect has a RCC designer working with him or for him . 3. Architect recommends a RCC designer. 4. Architect leaves the selection of RCC designer to the builder.
In the cases 1,2 & 3 builder has a one point dealing with the architect who gets all RCC drawings done from his consultant.
5.Whowillgettheapprovals?
This is regarding the permission to build [ municipality approvals] to be obtained from the competent authorities, prior to beginning the construction.
The options are :
1. Architect shall himself liaise with the authorities and shall get the corporation approvals. 2. Architect shall only give the drawings. The builder needs to liaise with the authorities to get the corporation approvals.
3. Builder appoints a Liaison Architect who just gets permissions & approvals.
6.WhoshallfightforyouinCourt of Law ?
This decision is related to the appointment of the Legal consultant who shall guide the builder through any legal disputes arising anytime during the acquisition of land up to handing over of the property to the customers and even beyond.
7.The Supervision :
This decision is related to how the construction is going to be supervised for Quality ,Quantity and delivery ?
There are several options :
1.Builder deploys his own employees for supervision.
2.Builder appoints PMC [ project Management consultant ] for supervision.
3. An experienced engineer is given the contract of entire supervision on % basis.
Summary :
The real success of the construction project ,like every other venture depends upon the formation of an effective team.
It is prudential to spend enough time and diligence to hand pick the team members.