Tag Archives: Clamps

What is the difference between scaffolding, shuttering and framework as per civil engineering?

https://www.surveymonkey.co.uk/r/DTB5WZQ

Answer by Santosh Kulkarni:

Thank you so much for the A2A.
Ravishankar has already given a comprehensive answer to this question.
However , let us deal the same question from a different perspective.

1. Form work :
All arrangement done to support the green concrete till it attains the strength is known as form work or temporary work.
Form work determines the geometry,shape.size and finish of the form work.

2
2.Centering :
Part of the form work which supports the horizontal surface is called centering for example slab bottomĀ  , beam bottom etc.

3.Shuttering :Part of the form work which supports the Vertical surface is called Shuttering for example column sides, beam sides,slab side ,wall side etc.

4.Staging : That portion which support centering & shuttering is called Staging. This can be :

  1. Wooden Ballies
  2. Pipes/Props/Jacks
  3. H frames
  4. Space frames using Coupler / Cup-Lock system

5.Scaffolding : That arrangement which is meant to be a supporting platform for people ( labor , supervisor, mason ,fitter,painter,carpenter etc. ) is known as scaffolding.

Now having defined the basic terms , let us see the site photographs for better understanding :

3

11

10

5

6

7

8

915

16

14

1

10

17

In case you are interested in finding out more about Form work Ā or have some questions about the rate analysis , do contact me with this form here :

Can you please spend two minutes for a small survey about this blog ?

Click HereĀ 

Blog Stats as on 1st May 2017 :

In case you desire to know further , you can visit the blog :
@Construction basics re-told .

What is the difference between scaffolding, shuttering and framework as per civil engineering?